Wednesday, July 29, 2020

The Build

The initial build took me about 2.5 months as I have a very small time window in the evenings in which to work.  Also as an early adopter I got to find many of the pitfalls in the build where once could get tripped up, but this allowed me to contribute to the documentation and improvements which I enjoyed.

This took me up to the point where I had one working tool, one out of 2 duet 3HC boards installed.  I struggled to have the machine ready for MRRF2020 which we all know was canceled.  But I would have had a machine ready to demo, a 1 tool tool change lol

Right now I have a fully updated CoreXY on my jubilee with gates pulleys aluminum corners and cross bar and also steppers.  I have 2 working tools using hemera extruders, and I am in the process of adding the second duet 3hc for 2 more tools.

My current future plans include:
1 or more bowden tools (I have the parts laying around)
Vinal Cutter
Rotary subtractive tool
Dry filament storage for up to 30 spools (designs in progress)
Reworking of my work space with new tables and storage solutions (table 1 in progress)


No comments:

Post a Comment

Correcting a bad mesh level.

From my previous post, when I first built my Jubilee my mesh showed a twist, I used a granite tile as a known flat surface; the resulting me...